Phase 6: Welding the carreola perimeter structure to the center post


The center post must be cut and trimmed to ensure a perfect fit.





After the joists were installed, we were able to lengthened the center post with a piece of six inch, thick wall steel pipe. This allowed the welding of the carreola rafters at the apex of the roof. 




As the carreolas are welded to the center post, the house begins to take shape.








Double checking to make sure that everything is "spot on"!




                   



Comments

Popular posts from this blog

Phase 10 - The Harpy’s Nest

Phase 2: The Deck